- Back to Home »
- Highway's »
- Chak No.214/Ml To Behal Road At More Chak No.76/Ml To Lalwala Via Zamaywala To Hotwala U/C Chak No.60-61/Ml Phase-II Length 2.82 Km
Chak No.214/Ml To Behal Road At More Chak No.76/Ml To Lalwala Via Zamaywala To Hotwala U/C Chak No.60-61/Ml Phase-II Length 2.82 Km
Posted by : Unknown
Monday, June 3, 2013
Dismantling
of brick soling
Earth work in ordinary soil for embankment lead upto 100 feet (30m) i/c ploughing and mixing with blade grade or disc Harrow or other suitable equipment and dressing to designed section complete in all respect compaction by mechanical means at optimum moisture content and 95% to 100% maximum modified AASHO dry density
P/L sub base course 6” thick of stone product of approved quality and grade, I/c placing, mixing, spreading and compaction of sub base material to required depth, camber, and grade to achieve 100% (maximum modified AASHO dry density, i/c carriage of all material from approved quarry to site of work crushed stone aggregate. Complete in all respect.
Earth work in ordinary soil for embankment lead upto 100 feet (30m) i/c ploughing and mixing with blade grade or disc Harrow or other suitable equipment and dressing to designed section complete in all respect compaction by mechanical means at optimum moisture content and 95% to 100% maximum modified AASHO dry density
P/L sub base course 6” thick of stone product of approved quality and grade, I/c placing, mixing, spreading and compaction of sub base material to required depth, camber, and grade to achieve 100% (maximum modified AASHO dry density, i/c carriage of all material from approved quarry to site of work crushed stone aggregate. Complete in all respect.
P/L
road edging of 3” wide & 9” deep brick on end complete in all respect.
Providing
and laying base course 4” thick of crushed atone aggregate of approved quality
and grade and supply and spreading of stone screening i/c placing mixing
spreading and compaction of base course material to required depth camber and
grade to achieve 100% maximum modified AASHO dry density i/c carriage of all
material to site of work except geavel aggregate subsequent carriage of crushed
stone aggregate.
Providing triple surface treatment to road, including supply of bitumen
and bajri/crushed stone aggregate of
approved quality, including cleaning of road surface, heating and spraying bitumen,
spreading bajri and rolling with Road Roller (including its operation cost,
fuel and hire charges, etc). complete including carriage of all material to
site of work except bajri/crushed tone aggregate using 67Lbs bitumen and 7.50
Cft crushed bajri per 100 Sft area crushed bajri will be kirana hill quarry to site of work Complete in all
respect.
Construction
of 2 span culvert
Informatory board size 6x4